Skip Navigation

Green Road Park Site Improvements Project - Draft Concept Plan Survey

Green Road Park Site Improvements Project - Draft Concept Plan Survey

What site improvements would you like to see at Green Road Park?

Take the survey below! 

As part of the 2022 Parks Bond Referendum, Raleigh Parks is proposing new site improvements to Green Road Park.  Improvements include park accessibility and safety enhancements, a new restroom building, site amenity renovations, recreational improvements, and public art.  

Raleigh Parks invites you keep sharing your thoughts and ideas during park design process.  Your thoughts regarding Green Road Park are important to ensure that visions for the park, amenities, and facilities meet the needs of the community.  Input received will be used in finalizing decisions on site improvements.

Project Schedule:

  • Summer 2023:   Initial project planning
  • Fall 2023 - Winter 2024:   Community Engagement, Concept Design, and Schematic Design
    • ​October 17, 2023:  Public Open House #1 - project visioning
    • February 3, 2024:  Public Open House #2 - draft concept plan
    • Spring 2024:  Public meeting to present schematic design plan
    • Spring 2024:  Presentation of the schematic design to the Raleigh Parks, Recreation and Greeway Advisory Board
  • Summer 2024 – Spring 2025:   Advanced Design and Permitting
  • Summer 2025 – Fall 2026:   Bidding and Construction

In October 2023, Raleigh Parks hosted the project's first open house.  Main takeaways include: 

  • Improved restroom facilities
  • More seating at ballfields
  • Gathering and open spaces for events
  • Improvements to park paths
  • Better connections between library, Community Center, and park
  • More picnic areas 
  • Larger and updated playground
  • More recreational opportunities such as futsal and pickleball

Ideas from Public Open House #1 were used to develop the draft concept plan shown below.

Raleigh Parks invites you to participate in the survey below.  Results from this survey and our other public engagement will help as we refine the Green Road Park plans.  

Step 1

How do you and/or your household members get to Green Road Park? (Select all that apply)

Vehicle
94%
Walk
12%
Bike
8%
Other
3%
Public Transit
2%
Closed to responses | 130 Responses

How often do you and/or your household members visit Green Road Park?

1-3 times/month
28%
Few times a year
27%
Once a week
21%
2-3 times/week
18%
Daily
3%
I do not visit Green Road Park
2%
Other
1%
Closed to responses | 141 Responses

Green Road Park has several existing park and recreational amenities. Which of these existing amenities are used and important to you and/or your household members? (Select all that apply)

Sand volleyball courts
75%
Enjoying the outdoors
26%
Green Road Community Library
20%
Community Center
17%
Picnic shelter
14%
Tennis courts
12%
Baseball fields
10%
Basketball court
9%
Cultural activities and events
7%
Other
6%
Closed to responses | 131 Responses

Rank the importance of these proposed site improvements to you.

Rank the importance of these proposed site improvements to you.
Closed to responses | 66 Responses

Are there other site features that you would like to see included the Green Road Improvements project that are not currently shown on the Draft Concept Plan?

Closed for Comments

The Draft Concept Design for Green Road Park currently proposes replacing the existing playground with a new playground layout, surfacing, and equipment. What types of playground equipment or elements would you like to see included in the future playground designs?

The Draft Concept Design for Green Road Park currently proposes replacing the existing playground with a new playground layout surfacing and equipment. What types of playground equipment or elements would you like to see included in the future playground designs?
Climbing structures / climbing walls
67%
Natural play elements / areas
55%
Swings
53%
Slides
49%
Sensory or activity panels
35%
Spinners / merry go rounds
33%
Net structures
33%
Sand play areas
29%
Musical / sound interactive feature
20%
Seesaws
16%
Other
8%
Closed to responses | 49 Responses

New public art will be included in the Green Road Park project. Where would you most like to see new artwork located in the park? In the comment box below, feel free to add any ideas of the types of public art you would like to see at Green Road Park.

New public art will be included in the Green Road Park project. Where would you most like to see new artwork located in the park? In the comment box below feel free to add any ideas of the types of public art you would like to see at Green Road Park.
Along park pathways
66%
In the proposed plaza area
59%
Outside of the community center
45%
In green open spaces
32%
At the playground
16%
Other
0%
Closed to responses | 44 Responses

Do you have any other comments on the Draft Concept Design?

Do you have any other comments on the Draft Concept Design?
Closed for Comments
Contact Information

If you would like to be part of our contact list for the Green Road Park project, please leave your information below. We will notify you of future community meetings and milestones in the project. Thank you!